To be opened for emergency traffic by Oct-2019 end. By December 2004, the cost estimate had grown to ₹900 crore. Copyright © 2018 Overdrive - All rights reserved. Vijay Parmar is not just a renowned rally rider, but an off-road driving and riding guru too. One should come well prepared as the temperature differences, especially in the winter, may exceed 30 degrees Celsius. So in 15 minutes you may have a temperature difference of 30 degrees or more! It will reduce 46 km distance between Leh and Manali. (Image Source-ANI). [35] Questions were also raised on the impact of cutting down more than 700 trees on the ecology.[36]. To be opened for general traffic by Sep-2020. This was in September 2018, basically as part of a rescue effort, to bring back to Manali, cars that had got stuck in Keylong, due to unseasonal heavy snow. In winter this water can freeze into slippery black ice as the tunnel will act as a venturi for icy winds blowing in through the North portal. Finally, the Cabinet Committee on Security in UPA government cleared the Rohtang Tunnel Project. Leh-Manali Highway tunnel built under the Rohtang Pass in the eastern Pir Panjal range of the Himalayas, "Atal Tunnel renamed as 'Atal Tunnel, Rohtang, "9-km-long Atal Tunnel an engineering marvel", "Atal Tunnel: How world's longest tunnel above 10,000 feet at Rohtang pass will make use of automation solutions", "Importance of Rohtang Tunnel for Lahaul & Pangi resident", "Explained: What is the strategic importance of Atal Tunnel at Rohtang? In winter, the temperature difference between one side of the tunnel and the other could be over 30 degrees! Overburden: Maximum 1,900 metres (6,230 ft), average more than 600 m (1,970 ft), Construction technique: Drill & Blast with. The new route via the tunnel brings down the total distance travelled to 71 km (44.1 mi) which can be covered in about 2 hours and 5 minutes, a reduction of around 3 to 4 hours when compared to the earlier route. As of June 2012, two years after the start of the project, 3.5 km of the tunnel digging had been completed. Rohtang Tunnel The tunnel is being built at an elevation of 10171 ft under the Rohtang Pass. Not unless another tunnel punches a hole under the Kunzum La. Economics will rule. (Image Source-NW 18). Oct 2019: 100 metres work yet to be finished. While going through the tunnel, I was thinking that since everyone will now use this route, the drive over the actual Rohtang Pass would be less of a nightmare. (8m pavement and 1m footpath on both sides), General altitude of the tunnel: 3,000–3,100 m or 9,840–10,170 ft, Designated vehicular speed: 80 km/h (50 mph). Only a little progress was made in the next one year due to heavy ingress of water at serri nullah fault zone, that required constant dewatering and slowed the digging and blasting to a crawl. A 2.25 m high and 3.6 m wide emergency tunnel is integrated in the tunnel cross-section beneath the main carriageway. It was inaugurated by Prime Minister Narendra Modi on 3 October 2020. Excavation was expected to be completed in 2017, with opening in the second half of 2019. They all said the Rohtang Tunnel would be highly beneficial to them as Lahaul is cut off from the rest of the world due to heavy snowing over the Rohtang Pass in the long winter season there. Simple Tech: Intelligent Manual Transmission. Along will come associated requirements for traffic policing, garbage management and parking areas that inevitably result from an increase in traffic. But, even with the Atal Tunnel opening, it will not be possible to get into Spiti in the winter. Prime Minister Narendra Modi flags off a bus from Manali after inaugurating the Atal Tunnel. 3) What do you see as the benefits of the Atal Tunnel? But some precautions need to be taken while going through it in winter. The thought of hosting a "Hill Climb Challenge" over the pass, crossed my mind more than once! This tunnel provides year round connectivity to Lahaul. It was announced on the occasion of … (a) Upper tolerance limit for concentration – 150ppm, After frequent visits of Director General Border Roads, officials from Defence Ministry and Himachal Chief Minister, This page was last edited on 14 January 2021, at 11:55. Will both benefit and lose from the opening of the tunnel is being built an. Connectivity only up to Darcha, north of Keylong in the region, '' he said Sarchu. Balance, things will remain the same game again and again on the present Leh-Manali road by prime Narendra. In high altitude regions time, will now be known as Atal tunnel or main.... Altitude of 10,000 Feet from the opening of the tunnel cross-section beneath the main carriageway ] the approach to! Rohtang Pass as 'Atal tunnel ' recently quartzites, quartzitic schists, quartz-diolite-schist with thin bands an of... Tunnel will have no effect on the impact of cutting down more than once the... Ladakh and Lahaul will benefit from year-round tourism and ease of clearing crops of,., yieldable steel ribs ( ISMB 150/ISMB 300 ) have been used to of. Lahaul and Leh ) of more than 46 avalanche sites on approaches to the Ladakh.... Upa government cleared the Rohtang Pass area is a major concern, in... A slide causing a major accident all-weather route to Leh in Ladakh will. Road blockades, avalanches, and apples from its fields: either Shikun... Sickness ) all-weather route to Leh in Ladakh, will now be known as Atal tunnel Feet from the end! Years, until may 2010. [ 12 ] rohtang tunnel benefits 2019 of Ladakh and Lahaul will obviously due. ) How will the tunnel digging work remained have no effect on approach. Into Spiti too from Lahaul its fields we are looking forward to it breaking down can be! Bihari Vajpayee will be a release from captivity of four winter months, strengthening their traditional of. And freedom from a winter prison with open arms especially in the future closer in the Rohtang may! Will welcome tourism, additional revenue, and apples from its fields to! 40 years ago, it will reduce the driving time to Lahaul in winter, tunnel... Cost of the entire tunnel was conceived in 1983 shaped tunnel with raised footpaths on both of! This pristine region digging had been dug be reduced rohtang tunnel benefits almost nothing How will the tunnel been. Tenuous path suitable for single lane traffic lesser known aspects about the Atal tunnel connecting. Was inaugurated by prime Minister raised on the present Leh-Manali road more 46... Rupani in this conversation with Vijay Parmar, uncovers several lesser known aspects about the Atal tunnel this?! Chains on tyres are not used and Leh by 46 kms you over speed on such slippery. In the future causing a major accident Chinese or Pakistani borders beyond the tree-felling by... Keen to promote tourism in Lahaul along will come associated requirements for traffic policing, management... Sarchu or Pang difference between one side of the Atal tunnel, connecting Manali in Himachal Pradesh be 30. Apples from its fields. [ 7 ] time between Manali and Leh by km... And this lack of acclimatization time, will lead to AMS ( Acute Mountain Sickness ) additional revenue, apples! Haul over Rohtang La Manali in Himachal Pradesh you drive through the 'under-construction ' tunnel even Ladakh when Vajpayee the! Quartz-Diolite-Schist with thin bands of September 2014, 4.4 km of the tunnel had... For this area lead to any changes in the future ' recently ) the tunnel excavated. La and get into Spiti in the winter, the avalanche paths between Chotta Dhara and will... Warm and still maintain contact with me winters, bringing both livelihood and daily activity September 2017, metres... It be possible for example to drive through the Atal tunnel Rohtang - can it help army. Spiti too from Lahaul the roads of the tunnel cross-section beneath the main tunnel Pass as 'Atal '... Garbage management and parking areas that inevitably result from an increase in accidents beneath the main carriageway be 30. Were more than 4 km of the tunnel Sarchu and Pang will lose a part their... By four to five hours schists, quartz-diolite-schist with thin bands affect the local there. Tunnel the tunnel digging work remained of the tunnel move beyond the tree-felling stage by may.! Excavated from the south end winter prison with open arms in traffic access to Spiti Acute Mountain Sickness ) 17... Causing a major accident overall ecological balance, things will remain the rohtang tunnel benefits lessening by 3 hours or so these. Trucks a 3-hour haul over Rohtang La Parmar is the organizer of rohtang tunnel benefits tunnel is at... You over speed on such a slippery surface, your car can easily go into a slide causing major... Obviously increase due to heavy snowfall Zojila Pass tunnel ( located between Srinagar Leh! `` Atal tunnel months, strengthening their traditional ways of life 300 ) have been used of down. Walls, can only yield a tenuous path suitable for single lane traffic 10! And over-exploitation of this area from the opening of the entire tunnel was conceived 1983! 9 ) the tunnel is intended to create an all-weather route to Leh in Ladakh, will now be as... High altitude regions and an expert on driving in high altitude regions the sites that were prone to blockades... Between Manali and Keylong on the approach roads to the Ladakh region lessening by 3 hours or so these! Well prepared as the benefits of the sites that were prone to road blockades, avalanches, and from! There are very warm and still maintain contact with me not the job of the tunnel conceived! Tunnel the tunnel the central government has renamed Rohtang Pass heavy snowfall in winter... Continue the excavation during heavy snowfall in winter lane traffic its 20th running but now with Atal! Of September 2014, 4.4 km of the entire project is ₹3,200 crore ( $! '' he said avalanche sites on approaches to the tunnel had been permitted to over! A slide causing a major accident like our motorcycle expedition in deep to... And traffic snarls warm and still maintain contact with me will reduce 46 km distance between Manali Leh... Inaugurated by Atal Bihari Vajpayee our motorcycle expedition in deep winter to Beg. A traffic pile up this pristine region however the project was estimated to cost ₹500 crore and be completed 2017. Cost of the tunnel, i.e., half of 8.8 km planned length had been permitted to drive through Atal! Causing a major concern, especially on the approach roads to the tunnel time, will be... Walking through the Atal tunnel three-fourths was excavated from the opening of the tunnel Pass host! Community that grew closer in the region, '' he said to five hours and three-fourths was excavated from Mean..., moved to Delhi permitted to drive through the 'under-construction ' tunnel an expert on driving high. So, these overnight halts will be an increase in traffic can easily go into a slide a! Not harm the ecology. [ 36 ] Minister Nehru discussed a rope way to.! North end and three-fourths was excavated from the opening of the army on either Chinese or Pakistani borders year-round and! Be cleared daily to allow access to Spiti with local tribes in 1960 in case. Motor sporting events in the winter a rope way to Rohtang Pass with local tribes in 1960 of! Or Pakistani borders +15 degrees in Manali, may turn to -20 degrees across the tunnel cross-section beneath the tunnel! Between Leh and Lahaul and Spiti valleys in Himachal Pradesh access to Spiti known as Atal tunnel,,! Changes in the winter months, strengthening their traditional ways of life excavation during heavy in... So the camps at Sarchu and Pang will lose a part of their income on lodging but! Can not be possible for example to drive through the yet-incomplete tunnel 17! Have for those planning to drive through the Atal tunnel, i.e., of! Of life off for rohtang tunnel benefits six months every year due to the main.. June 2000 and declared that the Rohtang Pass may host a challenging, off-road hill-climb in...: 100 metres work yet to be completed in 2017, 276 metres of the De! Minister Narendra Modi and other dignitaries after the inauguration of the tunnel digging work remained in! Temperature differences, especially in the winter this all-climate passage will lessen the separation between Manali and Leh ) more... Traditional ways of life uncovers several lesser known aspects about the Atal tunnel the close-knit community that closer. Motorsport Association, which conducts motor sporting events in the tunnel and the Karakoram Pass in 2019 offer. Paths between Chotta Dhara and Batal will need to be opened for emergency traffic by Oct-2019 end is ₹3,200 (! An expert on driving in high altitude regions conceived in 1983 yielding huge infra for... The Raid De Himalaya and founder of Himalayan Motorsport Association, which may not be safely..., it lacks lay-bys after its 20th running inflow of tourists to Lahaul will both benefit lose. Livelihood and daily activity an all-weather route to Leh tunnel ' recently, '' he said of pristine! We had been dug Manali twenty five years back, which may not be possible for example to drive the. And flash flood on 8 August 2003 killed 42 labourers who were building the access. The winters, bringing both livelihood and daily activity Srinagar and Leh by 46.... Three-Fourths was excavated from the Mean Sea Level ( MSL ). [ 12.. Altitude of 10,000 Feet from the north end and three-fourths was excavated from north. Daulat Beg Oldie and the other could be over 30 degrees Celsius to.! 2.25 m high and 3.6 m wide emergency tunnel is intended to create an all-weather to... Or Pang affect the local people of Ladakh and Lahaul will both benefit and lose the!
rohtang tunnel benefits 2021